14
Driven to achieve customer satisfaction
GRAITEC is constantly driven to
deliver complete customer satisfaction
. Every aspect of the customer
engagement process, from initial needs analysis to onsite customized project-based training, is an
opportunity for GRAITEC personnel to eloquently impress its strong company values in a way which
nurtures long term customer loyalty.
2
www.graitec.com13
Manchester Road Bridge, Bradford, UK
Design office:
Briton Fabricators Ltd
Architect office:
Briton Fabricators Ltd
“Using Advance Steel from GRAITEC gave us the means to generate both the model and associated detailed
drawings of a complex structure that we would not have been able to complete using AutoCAD® alone,
particularly to the level of accuracy that was achieved.”
Andrew Pont
, Draughtsman. Briton Fabricators Ltd
Page 11/12
AZ Tower, Brno, Czech Republic
Design office:
JAPE-projekt
Architect office:
Architektonická kancelář Burian - Křivinka
“This project was interesting for its shape, especially for its sloped pattern facade with many holes and
openings. After exploring the possibilities of available softwares, we chose Advance Concrete from GRAITEC.
Multi-User mode in Advance Concrete enabled multiple engineers to work on the model simultaneously.“
Ing. Jan Perla
, Managing Director, JAPE-projekt
Page 7/8
Capital Gate, Abu Dhabi
Design office:
Waagner-Biro Stahlbau AG
Architect office:
RMJM Dubai
“The Capital Gate project was a big challenge concerning geometrics, construction, detailing and assembly.
Advance Steel from GRAITEC increased the productivity in engineering and participating departments due to
its 3D abilities and the possibilities of comprehensive programming.“
DI Gert Weimann
, Head of Construction, Waagner-Biro Stahlbau AG
Cover
Cluj Arena Stadium, Cluj-Napoca, Romania
Design office:
Cluj-Napoca Technical University, Dico and Tiganas Office Design Cluj-Napoca,
Bogart Construct Cluj-Napoca, DAS Engineering Group
Architect office:
Dico and Tiganas Office Design Cluj-Napoca
“It is more than a stadium; it is the new landmark of the city in which we managed to capture the passion,
the emotions and most of all, spirit of fair-play thanks to GRAITEC technology.”
Florin Dico
, Engineer, Dico and Tiganas Office Design
Page 9/10
ARS Electronica Center, Linz Austria
Design office:
Grömer Stahl GmbH
Architect office:
Treusch Architecture ZT GmbH
“Advance Steel processed the entire 3D model data and accelerated all document creation saving an enormous
amount of time and ensuring all-around drawing consistency.”
Mr. Moser
, Project Manager. Gromer Stahl GmbH
Page13/14




